Aircraft Bluebook The Premier Resource
for Aircraft Values
Your Aircraft
Sales Report

Airworthiness Directives

NOTE - This AD note listing is intended as a guide only and should not be relied upon as conclusive evidence of AD applicability on any particular aircraft. Entire Airworthiness Directives may be accessed at: http://rgl.faa.gov.

Showing Results 921 - 940 of 5103 | View All
< Previous | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | Next >

AD No. MAKE Condensed description of ad note
05-19-20 Piper Inspect for fuel leaks as specified | PA-28-160/180/161/181
05-19-11 Lycoming Inspect crankshaft as specified | 540; 360 series
05-19-10 Turbomeca Superseded by 07-11-6
05-18-22 Raytheon Inspect left-hand & right-hand engine assembly cable, wire and hose routing clearance | Premier
05-18-20 Goodrich Inspect Goodrich fastprop propeller de-icers as specified | P4E series and other models
05-18-15 Dassault Revise AFM as specified | 2000EX
05-18-14 Dassault Superseded by 07-18-08
05-18-13 IAI Inspect electrical bundles in the overhead circuit breaker panel as specified | Westwind 1124, 1124A
05-18-12 Hartzell Inspect the Z-shank blade as specified | HC-92 series, HC-B3 series, BHC-92 series
05-17-6 Turbomeca Inspect engine air intake assembly half-cover as specified | Artouste III, B, B1, D series
05-17-19 Cirrus Supersed by 06-19-10
05-17-17 Turbomeca Superseded by 09-14-1
05-17-15 Turbomecca S.A. Inspect the fuel control unit (FCU) fuel filter as specified | Arrius 2F series
05-17-11 Cessna Inspect wires on both engine fire extinguisher bottles | 525, 525A, 525B
05-16-9 Learjet Supersedes 95-25-3 | Inspect both flappers of the tip tank in each wing as specified | 23, 24, 25, 35, 36
05-16-5 Robinson Inspect the left/right door assembly integral frame as specified | R-22
05-16-4 Bell Inspect crosstube for cracks as specified | 206A, 206B
05-16-2 Raytheon Inspect cockpit ventilation circuit breakers and avionics cooling system blowers as specified | HS.125-700, HS.125-800A, -800, -800XP
05-16-14 Gulfstream Inspect floor heater pad system as specified | G-IV, GIV-X, GV, GV-SP
05-16-13 Gulfstream Inspect the wiring, spice, connector or pins of the left and right fuel standby feed pumps as specified | G-200

Showing Results 921 - 940 of 5103 | View All
< Previous | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | Next >

In order to deliver a personalized, responsive service and to improve the site, we remember and store information about how you use it. This is done using simple text files called cookies which sit on your computer. By continuing to use this site and access its features, you are consenting to our use of cookies. To find out more about the way Informa uses cookies please go to our Cookie Policy page.